AMX APWeb Manual de instrucciones Pagina 30

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 34
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 29
Controlling the System
30
Instruction Manual – Precis DSP Matrix Switchers
Executing a Test Switch with BCS
The following test switch routes Input 2 to Output 1 (the level does not need to be specified since the Precis DSP only
switches audio).
To execute a test switch using BCS commands:
1.
Enter the following BCS command line:
CI2O1T
When the “T” appears, the system has successfully executed the command. If any other characters appear, the command
was not successful. Verify that the source signal is audible at the destination.
Important: When entering values for BCS gain commands, do not
add any leading zeros (e.g., to set the
volume to -9 dB, enter CO3VA-90T, do not enter CO3VA-090T).
Troubleshooting
If the test switch did not execute correctly:
Check the power indicator on the front of the enclosure.
If it is not illuminated, check the power cords.
Verify the status of the test switch.
If using BCS commands, enter “SO1T”. If “SO1T(2)” appears, the test switch is routed.
Vista de pagina 29
1 2 ... 25 26 27 28 29 30 31 32 33 34

Comentarios a estos manuales

Sin comentarios