
Installation
6
NXB-CCG NetLinx® Clear Connect™ Gateway
Installation
1. Find a suitable location for the NXB-CCG.
2. Mount vertically or horizontally (FIG. 3), using two #6 (M3) screws. When mounting, allow 7 in (177.8
mm) clearance for the antenna and ensure convenient access to the power plug. In order to achieve proper
RF performance, do not mount unit in a metal enclosure.
3. Attach the DC adapter cord to the power jack on the NXB-CCG and insert the DC adapter plug into a
receptacle (FIG. 2).
4. Use CAT5 Ethernet cable to connect the NXB-CCG to the chosen network’s Master. Please refer to the
Ethernet Pin Numbering diagram (FIG. 5) for the correct connection.
5. Clip the included CAT5 Suppression Ferrite around the Ethernet cable (FIG. 4), 2 to 3 inches (51-76 mm)
from the NXB-CCG’s Ethernet port.
FIG. 3 Installation Diagram
FIG. 4 Installing the CAT5 Suppression Ferrite
Vertical
Horizontal
Wall
Level Surface
1”
2.54 cm)
#6 (M3) screws
recommended
If the ferrite slips on the Ethernet cable, such as in a vertical installation, electrical or
duct tape may be wrapped around the cable to keep the ferrite in place.
Comentarios a estos manuales