1CPB-8 AUDIO VISUAL SYSTEM Project Scope The University of Texas MD Anderson Cancer Center is seeking responses to this RFP from qualified vendors
102.3 FIELD PRODUCTS- CONFERENCE ROOMS PROJECTION PRODUCTS A. Conference Room Video / Data Projector (VDP-3) - Sharp XG-V10XU with Buhl 732MCZ
11Provide required plenum rated bridal reigns and plenum ties. Meet provisions of N.E.C. Audio Plenum Rated Cable: West Penn 25452, West Penn 25291,
12wood, stained to match millwork in Conference Rooms. Mount equipment identified below into lectern. K. Multi-Media Lectern Gooseneck Microphone
13drawings. C. Wall Mounted Control System Touch Panel (WCP-1) - AMX AXD-CP4/A 4-inch color passive touch panel with 6 fixed external backlit illum
14 A. Basic Lectern (BL-1) -Van San Series 100 lectern or similar (quantity: 4) with light and clock. Finish to wood, stained to match millwork in C
15microphone states via Gentner XAP system RS-232 strings. Include screen layout and menu branching drawings in submittals. Provide new and install w
16Composite Video Plenum Rated Cable: West Penn 25806P. RGBHV Plenum Rated Cable: West Penn 258195 or Belden 1826A or Liberty RGB5C-SD-PLN. RGBHV UTP
17 I. Desk Mount Control System Presenter Touch Panel (CP-5) - AMX NXT-CV 12-inch Modero Color Video Table Top touch control panel (quantity: 1). Ow
18with rack mount kit. Install in Lectern and integrate into system as shown in drawings. H. Multi-Media Lectern DVD Player (DVD-L3) - Denon DVD-
19d. Progress Set of Project Record Documents 4. Mounting - Mount equipment and enclosures plumb and square. Ensure that permanently installed equi
2 PART 1 - GENERAL 1.1 DEFINITIONS A. Section Includes - Complete and working audio visual system for the Level 8 Conference Area and the Level
20washers, and appropriate connectors. Electrical Contractor to provide and connect #4 AWG green insulated wire to ground point in electrical panel.
212. Cables dressed, routed, and labeled, connected with proper polarity. 3. Insulation and shrink tubing in place 4. Dust, debris, solder splatte
22upon Consultant's arrival. Coordinate with all trades for quiet conditions throughout the listening areas and for the duration of the test sch
23systems. D. Inventory — Inventory all installed and portable equipment for correct quantities. E. Functional Demonstration — Demonstrate operat
3 C. Shop Drawings 1. Number of Sets: 6. Minimum Scale 2. a. b. c. d. Floor Plans: 1/8 inch = 1 foot Rack Elevations: 1 ½ inch = 1 foot Plate/Pan
4 E. Proposed Test Equipment — Submit, for approval, a letter listing test equipment make, model numbers and calibration dates 10 days prior to sch
5 5. Timetable a. Submit 1 set of Operation and Maintenance Manuals at least 10 days before Final Tests and Adjustments procedures (minus data from
63. Be Authorized Dealer for major lines of equipment provided. Must have at least one permanent staff member who is factory trained in the installa
7E. Storage Protection - Provide storage protection against temperature and humidity extremes, theft, vandalism, physical damage, and environmental
8the "out" or "in" positions. Provide new, and install in AV Rack as shown in drawings for use with setup and maintenance equipme
9antenna over Conference Room area. Test performance of wireless systems while transmitters are walked around all of the Conference Room area. If re
Comentarios a estos manuales